Requirements Deployment

The development the product begins with the deployment of the design inputs to the subsystems.  The following table describes the inputs and outputs of Deployment Process

InputsKey ActivitiesOutputs
Use Cases
Workflows, both primary and secondary

System Architecture
The subsystem partitioning as defined in the system design inputs. This should include the preliminary mapping used during the concept elaboration

System Requirements
The requirements from concept elaboration, including the essential requirements from the risk analysis

Interface Requirements
Details of the internal and external requirements

Manufacturing Capability
Characterization of capacity, measurement systems and process capability
Assessing Process Capability
The characterization the measurement system (gage R&R) against Performance Requirements and CTQs, focused on understanding the ability to meet the requirements

Design Worksheet Development
The analysis of the requirements, identifying those requirements that require a transfer function

Transfer System Deployment
Develop transfer functions from results of the Design worksheet development

System Transfer Functions
For those performance requirements with complex relationships, the details of the transfer function.

Workflow Diagrams
For those functional requirements with complex relationships, the details of the workflow and subsystem interactions.

Design Worksheet
The details of how the system design inputs and subsystem requirements interrelate

Subsystem Requirements
The subsystem requirements

N2 Chart
The interactions between the subsystems

A capability analysis of the manufacturing process and the ability of manufacturing to meet the various performance requirements initiates the process.  This analysis drives how the subsystem deployment proceeds and may lead to revision of the requirements.

Following confirmation that the manufacturing process can deliver on the requirements, the process focuses on how the requirements distribute between subsystems.  During distribution of requirements, design worksheets and transfer functions are developed in places where the deployment of the requirements creates interactions between the subsystems.  This may be formulas, design documents or, for functional requirements, workflow diagrams detailing the interactions between the subsystems

During deployment, it may be necessary to revisit and update design inputs, and deployment ensures that this happens well before the realization.  This lowers the cost and the associated rework of the process.

At the end of the process, the design worksheet, transfer functions and workflows serve as inputs to the final transfer function deployment.  Here the subsystem requirements are reconciled across the design worksheet and the final allocation of tolerances across the subsystems locked down.  The transfer functions, subsystem requirements and design worksheet form the basis for the system realization.

The workflow is shown in the following figure

Requirements Deployment
Requirements Deployment