Requirements Deployment
The development the product begins with the deployment of the design inputs to the subsystems. The following table describes the inputs and outputs of Deployment Process A capability analysis of the manufacturing process and the ability of manufacturing to meet the various performance requirements initiates the process. This analysis drives how the subsystem deployment proceeds …