{"id":280,"date":"2017-08-28T21:00:49","date_gmt":"2017-08-28T21:00:49","guid":{"rendered":"http:\/\/tgfrconsulting.com\/blog\/?p=280"},"modified":"2024-01-20T22:29:12","modified_gmt":"2024-01-20T22:29:12","slug":"requirements-deployment","status":"publish","type":"post","link":"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/","title":{"rendered":"Requirements Deployment"},"content":{"rendered":"<div class=\"entry\">\n<p>The development the product begins with the deployment of the design inputs to the subsystems.\u00a0 The following table describes the inputs and outputs of Deployment Process<\/p>\n\n<table id=\"tablepress-15\" class=\"tablepress tablepress-id-15\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">Inputs<\/th><th class=\"column-2\">Key Activities<\/th><th class=\"column-3\">Outputs<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\"><strong>Use Cases<\/strong><br \/>\nWorkflows, both primary and secondary<br \/>\n<br \/>\n<strong>System Architecture<\/strong><br \/>\nThe subsystem partitioning as defined in the system design inputs.  This should include the preliminary mapping used during the concept elaboration<br \/>\n<br \/>\n<strong>System Requirements<\/strong><br \/>\nThe requirements from concept elaboration, including the essential requirements from the risk analysis<br \/>\n<br \/>\n<strong>Interface Requirements<\/strong><br \/>\nDetails of the internal and external requirements<br \/>\n<br \/>\n<strong>Manufacturing Capability<\/strong><br \/>\nCharacterization of capacity, measurement systems and process capability<br \/>\n<\/td><td class=\"column-2\"><strong>Assessing Process Capability<\/strong><br \/>\nThe characterization the measurement system (gage R&amp;R) against Performance Requirements and CTQs, focused on understanding the ability to meet the requirements<br \/>\n<br \/>\n<strong>Design Worksheet  Development <\/strong><br \/>\nThe analysis of the requirements, identifying those requirements that require a transfer function<br \/>\n<br \/>\n<strong>Transfer System Deployment<\/strong><br \/>\nDevelop transfer functions from results of the Design worksheet development<br \/>\n<br \/>\n<\/td><td class=\"column-3\">System Transfer Functions<br \/>\nFor those performance requirements with complex relationships, the details of the transfer function.<br \/>\n<br \/>\nWorkflow Diagrams<br \/>\nFor those functional requirements with complex relationships, the details of the workflow and subsystem interactions.<br \/>\n<br \/>\n<strong>Design Worksheet<\/strong><br \/>\nThe details of how the system design inputs and subsystem requirements interrelate<br \/>\n<br \/>\n<strong>Subsystem Requirements<\/strong><br \/>\nThe subsystem requirements<br \/>\n<br \/>\n<strong>N2 Chart<\/strong><br \/>\nThe interactions between the subsystems<br \/>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-15 from cache -->\n<p>A capability analysis of the manufacturing process and the ability of manufacturing to meet the various performance requirements initiates the process.\u00a0 This analysis drives how the subsystem deployment proceeds and may lead to revision of the requirements.<\/p>\n<p>Following confirmation that the manufacturing process can deliver on the requirements, the process focuses on how the requirements distribute between subsystems. \u00a0During distribution of requirements, design worksheets and transfer functions are developed in places where the deployment of the requirements creates interactions between the subsystems.\u00a0 This may be formulas, design documents or, for functional requirements, workflow diagrams detailing the interactions between the subsystems<\/p>\n<p>During deployment, it may be necessary to revisit and update design inputs, and deployment ensures that this happens well before the realization.\u00a0 This lowers the cost and the associated rework of the process.<\/p>\n<p>At the end of the process, the design worksheet, transfer functions and workflows serve as inputs to the final transfer function deployment.\u00a0 Here the subsystem requirements are reconciled across the design worksheet and the final allocation of tolerances across the subsystems locked down.\u00a0 The transfer functions, subsystem requirements and design worksheet form the basis for the system realization.<\/p>\n<p>The workflow is shown in the following figure<\/p>\n<figure id=\"attachment_514\" aria-describedby=\"caption-attachment-514\" style=\"width: 6365px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment.png\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-514\" src=\"http:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment.png\" alt=\"Requirements Deployment\" width=\"6365\" height=\"3489\" srcset=\"https:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment.png 6365w, https:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment-300x164.png 300w, https:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment-768x421.png 768w, https:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment-1024x561.png 1024w\" sizes=\"auto, (max-width: 6365px) 100vw, 6365px\" \/><\/a><figcaption id=\"caption-attachment-514\" class=\"wp-caption-text\">Requirements Deployment<\/figcaption><\/figure>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The development the product begins with the deployment of the design inputs to the subsystems.\u00a0 The following table describes the inputs and outputs of Deployment Process A capability analysis of the manufacturing process and the ability of manufacturing to meet the various performance requirements initiates the process.\u00a0 This analysis drives how the subsystem deployment proceeds &#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[61,6],"tags":[15,17,24,30],"class_list":{"0":"post-280","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-archived","7":"category-product-design-and-development","8":"tag-deployment","9":"tag-design-worksheets","10":"tag-requirements","11":"tag-transfer-functions","12":"anons"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Requirements Deployment - TGFR Consulting LLC<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Requirements Deployment - TGFR Consulting LLC\" \/>\n<meta property=\"og:description\" content=\"The development the product begins with the deployment of the design inputs to the subsystems.\u00a0 The following table describes the inputs and outputs of Deployment Process A capability analysis of the manufacturing process and the ability of manufacturing to meet the various performance requirements initiates the process.\u00a0 This analysis drives how the subsystem deployment proceeds ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/\" \/>\n<meta property=\"og:site_name\" content=\"TGFR Consulting LLC\" \/>\n<meta property=\"article:published_time\" content=\"2017-08-28T21:00:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-01-20T22:29:12+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment.png\" \/>\n<meta name=\"author\" content=\"Timothy Robinson\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Timothy Robinson\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/\"},\"author\":{\"name\":\"Timothy Robinson\",\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/#\/schema\/person\/5e055d3bb1c73babd5af6a3d1f31ca05\"},\"headline\":\"Requirements Deployment\",\"datePublished\":\"2017-08-28T21:00:49+00:00\",\"dateModified\":\"2024-01-20T22:29:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/\"},\"wordCount\":238,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment.png\",\"keywords\":[\"Deployment\",\"Design Worksheets\",\"Requirements\",\"Transfer Functions\"],\"articleSection\":[\"Archive\",\"Product Design and Development\"],\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/\",\"url\":\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/\",\"name\":\"Requirements Deployment - TGFR Consulting LLC\",\"isPartOf\":{\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment.png\",\"datePublished\":\"2017-08-28T21:00:49+00:00\",\"dateModified\":\"2024-01-20T22:29:12+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#primaryimage\",\"url\":\"http:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment.png\",\"contentUrl\":\"http:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.tgfrconsulting.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Requirements Deployment\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/#website\",\"url\":\"https:\/\/www.tgfrconsulting.com\/blog\/\",\"name\":\"TGFR Consulting LLC\",\"description\":\"Transforming Medical Device Development\",\"publisher\":{\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.tgfrconsulting.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/#organization\",\"name\":\"TGFR Consulting LLC\",\"url\":\"https:\/\/www.tgfrconsulting.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2024\/11\/TGFR_Consulting.png\",\"contentUrl\":\"https:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2024\/11\/TGFR_Consulting.png\",\"width\":183,\"height\":103,\"caption\":\"TGFR Consulting LLC\"},\"image\":{\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"http:\/\/www.linkedin.com\/in\/tgfrobinson\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/#\/schema\/person\/5e055d3bb1c73babd5af6a3d1f31ca05\",\"name\":\"Timothy Robinson\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/www.tgfrconsulting.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/2e6854b703a237c3223c1fd92e8893bac38db9bc8f19904ee165380c5e180b2c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/2e6854b703a237c3223c1fd92e8893bac38db9bc8f19904ee165380c5e180b2c?s=96&d=mm&r=g\",\"caption\":\"Timothy Robinson\"},\"description\":\"With over 30 years of medical device experience, Tim leverages his knowledge to guide people through the process of successful product development\",\"sameAs\":[\"https:\/\/tgfrconsulting.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Requirements Deployment - TGFR Consulting LLC","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/","og_locale":"en_US","og_type":"article","og_title":"Requirements Deployment - TGFR Consulting LLC","og_description":"The development the product begins with the deployment of the design inputs to the subsystems.\u00a0 The following table describes the inputs and outputs of Deployment Process A capability analysis of the manufacturing process and the ability of manufacturing to meet the various performance requirements initiates the process.\u00a0 This analysis drives how the subsystem deployment proceeds ...","og_url":"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/","og_site_name":"TGFR Consulting LLC","article_published_time":"2017-08-28T21:00:49+00:00","article_modified_time":"2024-01-20T22:29:12+00:00","og_image":[{"url":"http:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment.png","type":"","width":"","height":""}],"author":"Timothy Robinson","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Timothy Robinson","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#article","isPartOf":{"@id":"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/"},"author":{"name":"Timothy Robinson","@id":"https:\/\/www.tgfrconsulting.com\/blog\/#\/schema\/person\/5e055d3bb1c73babd5af6a3d1f31ca05"},"headline":"Requirements Deployment","datePublished":"2017-08-28T21:00:49+00:00","dateModified":"2024-01-20T22:29:12+00:00","mainEntityOfPage":{"@id":"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/"},"wordCount":238,"commentCount":0,"publisher":{"@id":"https:\/\/www.tgfrconsulting.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#primaryimage"},"thumbnailUrl":"http:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment.png","keywords":["Deployment","Design Worksheets","Requirements","Transfer Functions"],"articleSection":["Archive","Product Design and Development"],"inLanguage":"en","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/","url":"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/","name":"Requirements Deployment - TGFR Consulting LLC","isPartOf":{"@id":"https:\/\/www.tgfrconsulting.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#primaryimage"},"image":{"@id":"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#primaryimage"},"thumbnailUrl":"http:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment.png","datePublished":"2017-08-28T21:00:49+00:00","dateModified":"2024-01-20T22:29:12+00:00","breadcrumb":{"@id":"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#primaryimage","url":"http:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment.png","contentUrl":"http:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2017\/08\/Requirements-Deployment.png"},{"@type":"BreadcrumbList","@id":"https:\/\/www.tgfrconsulting.com\/blog\/archived\/product-design-and-development\/requirements-deployment\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.tgfrconsulting.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Requirements Deployment"}]},{"@type":"WebSite","@id":"https:\/\/www.tgfrconsulting.com\/blog\/#website","url":"https:\/\/www.tgfrconsulting.com\/blog\/","name":"TGFR Consulting LLC","description":"Transforming Medical Device Development","publisher":{"@id":"https:\/\/www.tgfrconsulting.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.tgfrconsulting.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/www.tgfrconsulting.com\/blog\/#organization","name":"TGFR Consulting LLC","url":"https:\/\/www.tgfrconsulting.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/www.tgfrconsulting.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2024\/11\/TGFR_Consulting.png","contentUrl":"https:\/\/www.tgfrconsulting.com\/blog\/wp-content\/uploads\/2024\/11\/TGFR_Consulting.png","width":183,"height":103,"caption":"TGFR Consulting LLC"},"image":{"@id":"https:\/\/www.tgfrconsulting.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.linkedin.com\/in\/tgfrobinson"]},{"@type":"Person","@id":"https:\/\/www.tgfrconsulting.com\/blog\/#\/schema\/person\/5e055d3bb1c73babd5af6a3d1f31ca05","name":"Timothy Robinson","image":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/www.tgfrconsulting.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/2e6854b703a237c3223c1fd92e8893bac38db9bc8f19904ee165380c5e180b2c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/2e6854b703a237c3223c1fd92e8893bac38db9bc8f19904ee165380c5e180b2c?s=96&d=mm&r=g","caption":"Timothy Robinson"},"description":"With over 30 years of medical device experience, Tim leverages his knowledge to guide people through the process of successful product development","sameAs":["https:\/\/tgfrconsulting.com"]}]}},"_links":{"self":[{"href":"https:\/\/www.tgfrconsulting.com\/blog\/wp-json\/wp\/v2\/posts\/280","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tgfrconsulting.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tgfrconsulting.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tgfrconsulting.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tgfrconsulting.com\/blog\/wp-json\/wp\/v2\/comments?post=280"}],"version-history":[{"count":5,"href":"https:\/\/www.tgfrconsulting.com\/blog\/wp-json\/wp\/v2\/posts\/280\/revisions"}],"predecessor-version":[{"id":515,"href":"https:\/\/www.tgfrconsulting.com\/blog\/wp-json\/wp\/v2\/posts\/280\/revisions\/515"}],"wp:attachment":[{"href":"https:\/\/www.tgfrconsulting.com\/blog\/wp-json\/wp\/v2\/media?parent=280"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tgfrconsulting.com\/blog\/wp-json\/wp\/v2\/categories?post=280"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tgfrconsulting.com\/blog\/wp-json\/wp\/v2\/tags?post=280"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}